This project rehabilitated approximately 3,300 linear feet of the South Jetty at the mouth of the Columbia River, a structure regularly hit by 10 to 20-foot high ocean waves. Rognlin’s rebuilt the existing structures on the south face and elevated the crest to 25+ feet, which will help protect against storm activity and lost sand shoal material, increasing the reliability of the jetty system.
Client
J.E. McAmis, Inc.
Owner
Department of the Army Corps of Engineers
PROJECT COMPLETION
2023
CONTRACT VALUE
SUBCONTRACT VALUE
$11,562,263.85