City of Montesano – West Pioneer Improvements – 4th to 6th

Roads and Bridges

The project included all labor, materials and equipment for removal of sections ofasphalt roadway, sidewalks and concrete driveways, subgrade preparation planing of existing pavement surfaces as preparation for pre-level and final courses of Hot Mix Asphalt pavement, installation of concrete sidewalks and replacement of striping, Related utility work included installation of water system improvements and approximately 600-feet of storm drain and related catchbasins.

Client

Owner

City of Montesano

PROJECT COMPLETION

2020

CONTRACT VALUE

SUBCONTRACT VALUE

$180,000