The project included all labor, materials and equipment for removal of sections ofasphalt roadway, sidewalks and concrete driveways, subgrade preparation planing of existing pavement surfaces as preparation for pre-level and final courses of Hot Mix Asphalt pavement, installation of concrete sidewalks and replacement of striping, Related utility work included installation of water system improvements and approximately 600-feet of storm drain and related catchbasins.
Client
Owner
City of Montesano
PROJECT COMPLETION
2020
CONTRACT VALUE
SUBCONTRACT VALUE
$180,000